📊 1 Sep 2026 (Tue) — Daily Brief
Generated 2026-09-01 09:43 AEST by asx-monitor.
🔥 Price-sensitive announcements (today)
Sources: asxdotcom · 27 watchlist match(es) · 19 price-sensitive
- 14D — 14D Secures 100% of Aurora Energy Precinct · 14D · link
- 💰 acquisition_price: $350,000 · site_area: 16 km² · proposed_data_centre_capacity: 1 GW · stage_1_bess: 140 MW / 280 MWh (confidence: medium)
- MEM — EUR526,500 Nordic Agreement Expands Felix European Footprint · MEM · link
- 💰 Nordic_contracted_value_3yr: €526,500 · Initial_Q_order: €20,625 · European_countries_covered: 9 · Nordic_ART_cycles_2020: ~55,000 (confidence: medium)
- SNM — Change in substantial holding · SNM · link
- 💰 placement_size: $1,000,000 AUD · shares_placed: 1,724,138 · placement_price: $0.58 AUD · post_placement_voting_power: 21.7% (confidence: high)
- ABX — Rare Earth Drilling Underway in Tasmania · ABX · link
- 💰 TREO_grade: 844 ppm · Dy+Tb_content: 36 ppm (4.4% of TREO) · resource_tonnes: 89 Mt (41 Mt inferred, 42 Mt indicated, 6 Mt measured) · cash_on_hand: $0.6m (confidence: high)
- LIN — Trading Halt · LIN · link
- 💰 market_cap: 1415m AUD · cash_on_hand: 107.9m AUD · halt_duration: until 3 Sept 2026 or announcement release (confidence: medium)
- EGR — Trading Halt · EGR · link
- 💰 market_cap: 127m AUD · cash_on_hand: 3.8m AUD · 20d_performance: +14.6% · 5d_drift: +0.0% (confidence: medium)
- LTR — Liontown to earn up to 100% of the Centenario brine project · LTR · link
- 💰 initial_cash_outlay: US$5 million (
A$7 million) · initial_share_issuance: US$10 million (A$14 million) · phase_1_expenditure_earn: US$15 million over 24 months for 49% interest · total_potential_expenditure: US$40 million over 4 years (confidence: high)
- 💰 initial_cash_outlay: US$5 million (
- GNM — Drilling Contractor Secured at Iron Butte · GNM · link
- 💰 planned_rc_drilling: 3,000m · existing_mre: 480,000 oz Au, 11.5 Moz Ag (inferred) · best_rock_sample: 2.9 g/t Au, 259 g/t Ag (Iron Butte North) · high_grade_intersection_prior: 1.5m @ 13.5 g/t Au, 11.5 g/t Ag (confidence: medium)
- AYA — FY26 Financial Results and Operational Update Presentation · AYA · link
- 💰 market_cap: $694m · cash_on_hand: $44.0m · 20d_price_move: +4.7% · 5d_price_move: -6.0% (confidence: low)
- AR3 — Drilling commences on niobium-REE carbonatite discovery · AR3 · link
- 💰 aircore_program: 2,000m · magnetic_corridor: 10km · drill_traverses: 5 · oV167_intersection: 19m of anomalous REE/Nb mineralisation (confidence: medium)
- VPR — Volt On-Market Share Buy-Back · VPR · link
- 💰 buyback_authorization: 5% of issued capital · buyback_cost_estimate: $1.02m · issued_shares: 163.1m · last_close_price: $0.125 (confidence: high)
- AKN — Carbonatites Extend to End of 2nd Diamond Hole at 400m · AKN · link
- 💰 hole_26NH032_depth: 510.6 m · hole_26NH023_depth: 400.42 m · rc_program_total: 4,300 m across 31 holes · carbonatite_open_at_depth: both holes (confidence: medium)
- NXM — New High Grade Crusader Lode Returns 3m @18.75g/t Au · NXM · link
- 💰 Crusader_best_intersection: 3m @ 18.75 g/t Au · Crusader_context_13m: 13m @ 4.52 g/t Au · Clement_best_intersection: 6m @ 8.24 g/t Au · Total_RC_program: 21,985m across 196 holes (confidence: medium)
- MML — Outstanding Assay Results 5.44% HM Average from Surface · MML · link
- 💰 HM_average_grade: 5.44% · sampled_length: 1,199m · holes_reported: 74 · avg_thickness: 16.2m (confidence: medium)
- TMX — Ultrafine Fraction Soil Sampling at Carlindie - East Pilbara · TMX · link
- 💰 soil_samples_collected: 538 sites · first_pass_gold_peak: 0.119 ppm Au · samples_above_detection: 21 of 709 · detection_limit: 0.005 ppm Au (confidence: high)
- BUX — Madman DHEM Complete, Rig Secured to Test Conductor · BUX · link
- 💰 conductor_modelled_size: 400 × 400 m to 1,000 × 1,000 m · conductor_distance_from_md003dd: 250 m north-northeast · modelled_conductance: 400–1,000 S · planned_hole_depth: 800 m (confidence: medium)
- ZEU — Diaguili DD Visit Confirms Outcropping Copper Mineralisation · ZEU · link
- 💰 copper_outcrop_strike: ~1 km · historical_best_intercept: 35 m @ 1.44% Cu · rock_chip_samples_pending: 4 (confidence: high)
- AT4 — Tungsten APT Refinery Expansion to Commence · AT4 · link
- 💰 APT_Phase_1_capacity: 2,500 tonnes per annum · APT_Phase_2_expansion: 5,000 tonnes per annum · study_level: FEL1 Concept Study · engineering_partner: Metso Finland Oy (confidence: medium)
- NVU — US Patent Granted for ECS-DoT Object Detection Technology · NVU · link
- 💰 patent_number: US 12,651,452 B2 · hardware_speedup_vs_software: 75x · hardware_speedup_vs_prior_sota: 13.4x · next_gen_node: 16nm (confidence: medium)
⏭️ Non-sensitive announcements (watchlist)
8 announcement(s) across 8 ticker(s): ASN, CBA, EIQ, ITM, LTR, OD6, VLS, VPR