← Home

CPN

Critical MineralsEXTENDED⛏ drilling

$0.140

as of 2026-09-09

5d return

+12.0%

20d return

+7.7%

60d return

+47.4%

RSI 14

71.4

vs 52w high

-24.3%

vs 52w low

+118.8%

SMA 20

Above

SMA 50

Above

Price · Volume · Broker flow
Markers = announcements (red triangle = price-sensitive). Volume amber = ≥2× ADV spike.
Loading chart…
Closest correlates
Pearson r on log returns, window: 82d
  • WAUr=0.41, window: 82d
  • GCMr=0.35, window: 82d
  • LSRr=0.32, window: 82d
  • HVYr=0.31, window: 82d
  • SGAr=0.27, window: 82d
Announcements — last 30 days
  • CPN has unearthed historical 1970s drilling at Taylors Hill showing 3–10m intervals of tungsten at 1–3.7% WO3 plus tin, recontexted by modern soil geochemistry revealing an 800m tungsten anomaly and rising prices (6× tin, 20× copper). The prospect is early-stage reconnaissance with pending rock chip assays; no new drilling announced yet.

⛏ Drilling active — 68 days since first flagged day