← Home

GA8

Gold & Precious MetalsCOILED⛏ drilling

$0.056

as of 2026-07-27

Who's been buying — 30 days

net $, conviction-weighted
RetailRetail · context+$134k
NIBInvestment banks+$132k
WAWealth & advisers+$69k
MMMarket makers+$47k
ResResource specialists+$31k

5d return

-3.5%

20d return

-3.5%

60d return

-27.3%

RSI 14

40.9

vs 52w high

-34.1%

vs 52w low

+460.0%

SMA 20

Below

SMA 50

Below

Price · Volume · Broker flow
Markers = announcements (red triangle = price-sensitive). Volume amber = ≥2× ADV spike. Flow bars stacked per broker group. Flow lags T+3.
Loading chart…
Closest correlates
Pearson r on log returns, window: 42d
  • DTIr=0.54, window: 42d
  • RCLr=0.48, window: 42d
  • CUFr=0.40, window: 42d
  • PPSr=0.38, window: 42d
  • GBRr=0.37, window: 42d
Announcements — last 30 days
  • GoldArc's Mt Stirling Well grade control results confirm systematic high-grade quartz-vein shoots (peak 31.0 g/t Au) consistent with the 2.3 g/t resource estimate, strengthening ore body definition ahead of MDCP approval. Four successive batches of repeatable intercepts and partner-funded drilling (fully funded by BMLV, 50/50 NPS) de-risk the Leonora North development path toward production.

  • Grade control drilling at Mt Stirling Well has returned the deposit's strongest intercepts to date (4m @ 9.24 g/t Au, multiple >7 g/t Au shoots), validating the 2.3 g/t Au resource model and supporting mine planning ahead of anticipated MDCP approval. Results confirm narrow high-grade quartz-vein mineralisation consistent with existing geological interpretation.

  • GA8 has completed first-phase grade control drilling at Mt Stirling with consistent 2–2.4 g/t Au intercepts and localized high-grade zones (6–11 g/t), confirming the geological model and informing mine planning ahead of MDCP approval. Partner-funded drilling (BML Ventures 50/50 net profit share) de-risks execution while the company progresses toward production.

⛏ Drilling active — 61 days since first flagged day