PNN
LithiumCOILED⛏ drilling$0.170
as of 2026-09-09
5d return
+6.3%
20d return
-2.9%
60d return
+17.2%
RSI 14
50.0
vs 52w high
-24.4%
vs 52w low
+136.1%
SMA 20
Above
SMA 50
Above
Power has secured state-level priority-project designation from Minas Gerais, placing Morro do Ferro on an expedited environmental licensing pathway and coordinating multi-agency support for exploration-to-development transition. This is an institutional de-risking step, not a resource update or production milestone; the company remains in drilling and pre-feasibility phase with a maiden JORC resource as the next material gate.
PNN has extended high-grade rare earth mineralisation to 186m downhole at Morro do Ferro, identifying a new deep zone (7.85% TREO, 2.11% MREO at 184–186m) with 67.55m of assays still pending—a material expansion of the deposit's vertical extent and tenor ahead of maiden MRE. The stock is already +6% over 5d and +17% over 20d on drilling momentum; this announcement confirms depth and scale but does not yet quantify resource tonnage.
PNN has extended a fourth drillhole (MFSR-054) delivering 88m at 6.33% TREO (1.19% MREO) from surface, with a 20m sub-interval grading 12.05% TREO and 2.18% MREO—results consistent with prior holes and supporting a maiden MRE in the near term. The deposit shows textbook massive, gradational geometry, favourable for open-pit economics and potentially lower mining cost than structural complexity would suggest.
PNN has called a trading halt pending material assay results from the Morro do Ferro rare-earth project in Brazil—a categorical rarity catalyst for the stock. With $7.5m cash against a $70m market cap and a flat 5d tape, the halt suggests the company is managing a potentially high-impact announcement.
Trading halt with image-only announcement prevents fundamental assessment; the institutional confluence flag and modest retail inflow ($462k over 5d) suggest routine corporate action rather than material discovery, but announcement opacity prevents confidence in either direction.
(interpretation unavailable)
PNN's second diamond hole confirms thick, coherent high-grade rare-earth mineralisation from surface with exceptional magnet-REE (NdPr+DyTb) content and elevated heavy rare earths, directly replicating and widening the grade envelope from hole one. Early-stage drilling momentum with two rigs operating and metallurgical sampling underway positions the Morro do Ferro project as a potential premium magnet-REE development asset amid global supply-chain diversification demand.
PNN has halted trading pending release of material assay results from its Morro do Ferro rare-earth project in Brazil, suggesting drill results are ready for disclosure. The 20-day run-up of +48% implies the market has been pricing in positive exploration news ahead of this announcement.
⛏ Drilling active — 91 days since first flagged day