SHN
Gold & Precious MetalsCOILED⛏ drilling$0.029
as of 2026-07-27
5d return
+7.4%
20d return
+0.0%
60d return
+0.0%
RSI 14
50.0
vs 52w high
-38.3%
vs 52w low
+163.6%
SMA 20
Above
SMA 50
Below
- 2026-07-22Noosa Mining Investor Presentation
Sunshine has completed a systematic airborne survey identifying fault architecture and buried intrusions at Sybil, with new high-grade vein targets (Pancho 21.6 g/t Au, Cisco 6+ g/t Au) validated by rock chip sampling. Imminent RC drilling across three prospect areas aims to extend previous bonanza-grade results and test untested Francis Creek East.
SHN upgraded Liontown's gold-focused resource by 13% contained gold and 28% in tonnes, with 75% now in Measured/Indicated classification and 92.3% metallurgical recovery demonstrating near-term milling viability via acquired Mt Moss facility (target mid-2027 start). Updated Mining Study due August 2026 will integrate these results and owner-operator upside.
Sunshine has secured Mt Moss as its processing hub for Liontown gold production ramp-up, completing a $18M acquisition with solid refurbished infrastructure and 300 Ktpa grinding capacity ready for gold circuit retrofit by mid-2027. Capital raise ($26.6M) and debt financing discussions underpin construction readiness, with drilling at Sybil imminent and multiple project milestones tracked through H2 2026.
⛏ Drilling active — 13 days since first flagged day